Medical device contract manufacturing: choosing a PCBA partner
Short answer
In medical device contract manufacturing, a specialist builds part or all of your device to your specifications while you remain the legal manufacturer: you own the design, the regulatory submissions, the labeling and the complaints. For the printed circuit board assemblies inside a device, look for an ISO 13485 certificate whose scope covers PCB assembly, lot traceability, a written quality agreement with change notification, and delivery and quality data you can check.
Who is the manufacturer when a contract manufacturer builds your boards?
You are. The company that designs the device, or has it designed and built, and sells it under its own name is the manufacturer in the regulatory sense. The EU Medical Device Regulation counts anyone who “has a device designed, manufactured or fully refurbished” and markets it under its own name or trade mark (Article 2(30)). In the US, 21 CFR 820.3 includes specification developers in its definition of a manufacturer.
A contract manufacturer (CM) that builds your printed circuit board assemblies is making a component. Part 820 defines a component as any “raw material, substance, piece, part, software, firmware, labeling, or assembly” meant to be included in the finished device. A CM that assembles the complete, working device for you is a different relationship, covered in what the QMSR means for PCBA suppliers.
| Device maker (you) | PCBA contract manufacturer | |
|---|---|---|
| Design and design controls | Owns them | Builds to your released documents; raises manufacturability issues |
| Marketing authorization, registration and listing | Owns them | Not the CM's; component makers are generally exempt from registration (21 CFR 807.65(a)) |
| Labeling, UDI, complaints, adverse event reports | Owns them | Supports investigations with build records |
| Supplier control | Controls the CM | Controls its own suppliers of parts and bare boards |
| Workmanship, inspection and test | Specifies them | Performs and records them |
| Traceability and build records | Defines what's needed | Creates and keeps them |
| Changes | Approves them | Notifies you before making them |
What should the quality agreement with a medical CM cover?
A quality agreement is the written contract for quality: who does what, to which documents, and what happens when something changes or goes wrong. ISO 13485:2016 requires written quality agreements when a process that affects product conformity is outsourced (clause 4.1.5), and asks that purchasing information include, where applicable, an agreement that the supplier will tell you about changes before making them (clause 7.4.2).
For a PCBA supplier, the agreement usually covers:
- Controlled documents: which drawing, BOM and test-spec revisions apply, and how new revisions reach the CM.
- Workmanship standard: IPC-A-610 and the class, plus any criteria of your own.
- Approved parts: your approved manufacturer list, and a rule that no alternate is used without your written approval.
- Change notification: advance notice of changes to parts, processes, equipment, sub-tier suppliers or build location.
- Nonconforming product: when you're told, who approves deviations and use-as-is decisions, and how rework is controlled.
- Traceability and records: the level of traceability, what ships with each lot, and how long records are kept.
- Audits: your right to audit and how findings are closed.
- Returns: how RMAs, failure analysis and corrective actions are handled and reported.
How do device makers control a contract manufacturer?
Through purchasing controls scaled to risk. ISO 13485 clause 7.4 requires you to evaluate and select suppliers on their ability to supply conforming product, with controls proportionate to the supplier's effect on the device and the risk involved, and then to monitor and re-evaluate them. A board that runs therapy or monitors a patient warrants more control than a mounting bracket.
In the QMSR final rule, FDA calls this an “ongoing risk-informed assessment of suppliers” and notes that certification may not be enough “without further evaluation.” Typical controls for a PCBA supplier:
- A qualification audit, on site or remote, against your requirements and ISO 13485.
- Verification of the CM's certificate and its scope: how to read an ISO 13485 certificate.
- First article inspection on the first build of each new revision.
- Incoming inspection or test on your side, set by risk.
- Ongoing monitoring of on-time delivery, returns, nonconformances and corrective actions.
Ask for actual delivery and quality data, and how it's counted. Surface Art is one of very few CMs that publish theirs: 99.81% on-time delivery and a 0.02% RMA rate for January–June 2026. On time means by the date the customer requested and Surface Art quoted; the RMA rate counts every return, against the month the units shipped. The figures are updated every six months.
How does design transfer to production work with a CM?
Design transfer turns your design outputs into production specifications the CM can build to, repeatably. ISO 13485 clause 7.3.8 requires that outputs are verified as suitable for manufacturing before they become final production specifications, and that production capability can meet product requirements. For a board, that usually runs:
- DFM and DFT review of the layout, BOM and drawing, with issues settled before release.
- Prototype or pilot builds on the production process where possible, so you learn about the process as well as the design.
- First article inspection against the drawing and BOM.
- Test development: flying probe, in-circuit or functional test, and the coverage each provides.
- Process validation where results can't be fully verified by later inspection or test (clause 7.5.6), as your risk analysis decides.
- Release: a frozen revision of every document, under change control from then on.
Moving a proven build to a different shop for production repeats much of this work, so it helps when one CM can carry the program from prototype into production at your volumes. The file-by-file checklist for a first build: NPI checklist.
What traceability and records should a medical PCBA supplier keep?
Enough to answer one question quickly: if a component lot or a process step turns out to be bad, which of your devices contain it? ISO 13485 requires product identification throughout production (clause 7.5.8), documented traceability procedures (clause 7.5.9.1) and controlled records (clause 4.2.5), kept for at least the lifetime of the device as you define it, and not less than two years from release.
For a printed circuit board assembly, a useful build record links:
- Board serial numbers or lot code, the work order and the document revisions used.
- Component manufacturer, part number and lot or date code.
- The bare board fabrication lot and the solder materials used.
- Inspection and test results: AOI, X-ray, flying probe, in-circuit or functional test.
- Nonconformances, rework and repairs, with who approved them.
- The certificate of conformance shipped with the lot.
Set the level with your risk analysis: lot-level traceability suits many products, while higher-risk ones may need serial-level records down to component lots. For devices that support or sustain life, FDA's QMSR applies ISO 13485's stricter traceability clause, 7.5.9.2. More in FDA QMSR: what it means for your PCBA supplier.
What should you send a medical PCBA contract manufacturer for a quote?
The same package as any PCB assembly quote, plus the quality requirements that affect the price:
- BOM in Excel with a manufacturer part number on every line and approved alternates marked.
- Board data: Gerber, ODB++ or IPC-2581 files, with the centroid file.
- Assembly drawing (PDF) stating the workmanship standard, such as IPC-A-610 Class 2 or Class 3, the solder alloy, and special instructions. How the classes differ: IPC Class 2 vs Class 3.
- Quantities: each quantity break you want priced, plus annual volume.
- Test requirements: flying probe, in-circuit or functional, and who provides fixtures.
- Quality requirements: your supplier quality manual or draft quality agreement, the traceability level, serialization, and the records you want with each lot.
Surface Art asks for the BOM in Excel with manufacturer part numbers, a PDF assembly drawing that states the workmanship standard, and quantity breaks with annual volume. It pulls the datasheet for every part for process review, then sends its clarifying questions and states its assumptions before quoting. It has held ISO 13485 certification since 2012, now to ISO 13485:2016 from DQS Inc., for “the contract manufacturing and testing of printed circuit board assemblies for the medical device industry,” and during COVID it built complete ventilators and kept running through the pandemic. Request a quote.
What questions should you ask a medical device contract manufacturer?
- Does your ISO 13485 certificate's scope cover PCB assembly at the site that will build my boards, and when does it expire?
- Which ISO 13485 clauses do you exclude or treat as not applicable, and why?
- Will you sign our quality agreement, including advance notice of changes?
- What traceability do you keep by default, and can I see a sample build record?
- Where do you buy components, and how do you keep counterfeit or mishandled parts out?
- What inspection runs on every build, and when do you use X-ray?
- How do you handle nonconforming boards, and when would you ask me to approve a deviation?
- What test coverage can you provide, and who builds the fixtures?
- What were your on-time delivery and return rates last period, and how do you count them?
- Can you carry us from prototype into production, and at what volumes?
- Can we audit you, and who is our quality contact?
What are the red flags when choosing a medical device CM?
- A certificate that doesn't fit: expired, unverifiable, issued for another site, or a scope that doesn't mention assembly.
- “FDA approved” or “FDA certified” facility claims. FDA authorizes devices for marketing; it does not approve manufacturing facilities on their own, and registration does not denote approval.
- Reluctance to sign a quality agreement or to commit to change notification.
- Silent substitutions: alternates used without your written approval.
- No sample traceability record, or traceability that stops at the work order.
- A quote with no questions on a complex BOM. Careful CMs ask before they price.
- A lead time promised before anyone has reviewed the BOM.
- Quality claims without data, or percentages with no definition of what was counted.
This guide is general information about choosing a contract manufacturer, not regulatory or legal advice. Confirm the requirements for your device with your regulatory and quality team.
Sources
- 21 CFR Part 820, Quality Management System Regulation (eCFR)
- Medical Devices; Quality System Regulation Amendments, final rule, 89 FR 7496 (Feb. 2, 2024)
- 21 CFR 807.65, Exemptions for device establishments (eCFR)
- FDA: Who must register, list and pay the fee
- FDA: Is it really “FDA approved”?
- Regulation (EU) 2017/745 on medical devices, Article 2(30) (EUR-Lex)
- ISO 13485:2016, Medical devices: Quality management systems (ISO)
- Surface Art ISO 13485:2016 certificate (PDF)